Water hammer is one of those problems that rarely announces itself during design reviews. On drawings, tall fire risers look orderly and predictable—vertical pipe runs, zone valves at clean intervals, pumps sized with comfortable margins. Everything appears controlled.
Then the system is tested.
Or worse,...